Restaurant Refurbishment London

What Should I Plan Before Construction Starts?

Planning to refurbish your restaurant but worried about unexpected costs, construction delays or having to close for longer than expected?

Before construction begins, you need a clear layout, agreed budget, realistic schedule and the necessary approvals. Making these decisions early can help you avoid expensive changes once builders are on site.

Whether you’re updating a small café or renovating an established London restaurant, here’s what you should consider before starting work.

1. My restaurant looks outdated, but I don’t want to renovate everything. How do I decide what actually needs changing?

Terracotta banquette booth seating in a Stanmore restaurant and café
Booth-style banquette seating designed for a welcoming restaurant interior.

Start with the problems affecting your restaurant every day.

Are the seats uncomfortable? Does the dining room look tired? Is the bar difficult to use, or is the kitchen layout slowing down service?

You may only need new lighting, furniture and finishes rather than a complete refurbishment.

Prioritise improvements that solve practical problems before spending on decoration.

2. Can I keep my restaurant open while refurbishment work is happening, or will I need to close completely?

Restaurant and café exterior entrance in Stanmore, North West London
Exterior entrance of the Stanmore restaurant and café interior design project.

It depends on the work involved and whether customers and staff can continue using the premises safely.

Simple decorating or furniture replacement may be easier to arrange around trading hours.

However, kitchen alterations, electrical work or changes to essential services may require temporary closure.

Ask your contractor whether work can be completed in phases and how food safety, access and construction areas will be managed.

3. Before I change the restaurant layout, bar or kitchen, do I need permission from my landlord or local council?

Possibly. Check your lease before making alterations, as your landlord may require written consent.

Some works may also need Building Regulations approval, planning permission or changes to your premises licence.

If the restaurant is in a listed building, additional consent may be necessary.

Check with the relevant London borough before construction begins, particularly if you’re changing entrances, extraction, capacity or internal arrangements.

4. I want to add more tables during my restaurant refurbishment. How can I increase seating without making the dining room feel overcrowded?

Window seating in a riverside restaurant in Kingston upon Thames
Restaurant window seating from a Kingston upon Thames riverside interior.

Start with the existing floor plan and check how customers and staff move around the space.

You might be able to introduce banquette seating, smaller tables or a different furniture arrangement.

However, adding seats shouldn’t block service routes, accessible circulation or emergency exits.

Our guide on how to plan a restaurant layout explains how to balance seating capacity with comfort and service.

5. My restaurant already has a kitchen, ventilation and plumbing. How do I know what can stay and what needs replacing?

Have the existing services and equipment assessed before finalising your refurbishment budget.

A kitchen may appear functional but still need electrical, drainage or extraction upgrades to support your menu.

Check equipment condition, available capacity and maintenance requirements.

Keeping suitable existing installations may reduce unnecessary work, but don’t assume everything can be reused without inspection.

6. How much should I budget for refurbishing my restaurant in London, and what extra costs should I prepare for?

Bar stools in a riverside restaurant in Kingston upon Thames
Bar stool seating within a Kingston upon Thames restaurant interior.

Your budget depends on the size of the premises, existing condition and extent of the work.

Include design fees, construction, furniture, kitchen equipment, lighting, installation and applicable VAT.

Also allow for unexpected repairs and the financial impact of any closure.

Our restaurant interior design cost guide can help you understand the different budget categories before requesting quotations.

7. How early should I order new restaurant furniture, bespoke seating, bar counters and lighting to avoid delaying construction?

Confirm the specifications and delivery dates before finalising your construction programme.

Bespoke seating, specialist lighting and custom joinery may take longer to manufacture than standard products.

For example, a new bar counter may need electrical and plumbing connections positioned before installation.

Ordering early helps, but only after the dimensions and technical requirements have been agreed.

8. What happens if builders discover damaged flooring, old wiring or other problems after the restaurant refurbishment has started?

Unexpected issues can affect both costs and the construction schedule.

Before approving additional work, ask the contractor to explain the problem, proposed solution, price and any effect on the completion date.

Keep a contingency suited to the condition of the property.

Surveys before construction may identify some problems, but they cannot eliminate every uncertainty.

9. I’m hiring an interior designer, contractor and different suppliers. Who should be responsible for managing the restaurant refurbishment?

Olive upholstered dining chair in a Greenwich restaurant

Responsibilities should be agreed before construction begins.

Confirm who prepares technical drawings, manages contractors, orders materials, checks installation and approves changes.

A coordinated design and build service can bring design and refurbishment delivery together, depending on the appointment.

However, the restaurant owner still has relevant legal responsibilities as a commercial construction client.

10. How do I know when my restaurant is ready to reopen after refurbishment, rather than just when the builders have finished?

Before reopening, check that the agreed work is complete and essential equipment and services are functioning properly.

Review cleaning, food preparation areas, fire safety arrangements, access and any required inspections or approvals.

Allow time for staff to become familiar with changes to the kitchen or service layout.

A finished-looking dining room doesn’t necessarily mean the entire restaurant is ready for customers.

 

What Should I Have Ready Before Starting My Restaurant Refurbishment?

Before appointing a refurbishment team, prepare the information needed to define the project.

This should include:

  • Floor plans and photographs: The current layout and condition of the premises.
  • Refurbishment priorities: What you want to improve and what can remain.
  • Budget: Your approximate investment and contingency.
  • Trading arrangements: Whether the restaurant must remain open.
  • Timescale: Your preferred construction and reopening dates.
  • Existing information: Lease restrictions, equipment details and any known building problems.

These details provide a useful starting point for assessing the scope and preparing a realistic programme.

Planning to Refurbish Your Restaurant in London?

A successful restaurant refurbishment starts before construction begins.

Getting the layout, budget, approvals and programme agreed early can help reduce unnecessary changes and make the project easier to manage.

At Oraanj Interior Design, we help restaurant owners with restaurant interior design in London, including space planning, technical design, lighting, furniture and coordinated refurbishment delivery.

Whether you’re refreshing an existing restaurant or planning a more extensive renovation, our team can help you explore the practical and design requirements.

Contact Oraanj to discuss your restaurant refurbishment.

Share your restaurant’s location, floor plan, photographs, approximate budget and preferred reopening date so we can understand your project.