A Welcoming Journey from Reception to Guest Room
This Westminster hotel scheme brings residential warmth to the guest experience through coordinated colours, furniture and architectural detailing.
A statement reception counter establishes the arrival point. Beyond it, lounge seating and dining arrangements offer places to pause, meet and spend time outside the bedroom.
Warm neutral tones, timber finishes and selected olive accents connect the public spaces with the guest accommodation. Decorative pendants introduce character, while integrated lighting gives corridors and bedrooms a consistent design direction.
The approach considers the hotel as a sequence of connected experiences rather than a collection of separate rooms.
Commissioned within Knightsbridge and serving clients across nearby Mayfair, this project reflects our studio’s architectural approach to luxury hotel interior design.
Spatial Organisation, Craftsmanship & Finishes
A contemporary hotel interior scheme combining a sculptural reception, comfortable lounge and dining spaces, warm corridors and coordinated guest-bedroom detailing. Every material junction and surface finish was curated through our bespoke custom furniture design and upholstery practice.
A statement reception counter establishes the arrival point. Beyond it, lounge seating and dining arrangements offer places to pause, meet and spend time outside the bedroom.
Feature
A Sculptural Reception Counter
The reception provides a clear visual anchor, with its dimensions and working arrangements developed around staff and guest requirements.
Feature
Comfortable Lounge Settings
Grouped seating creates places for informal meetings, waiting and relaxation within the shared areas.
Feature
Coordinated Dining Spaces
Furniture and lighting distinguish the dining setting while maintaining continuity with the lounge.
Project Overview & Spatial Parameters
A comprehensive overview of property parameters, scope of works, and core design objectives.
Location
Westminster, London
Sector
Hotel and hospitality
Design focus
Guest arrival, shared spaces and bedroom interiors
Spaces described
Reception, lounge, dining area, corridors and guest bedrooms
Principal features
Sculptural reception counter, timber detailing, upholstered furnishings and statement lighting
Budget basis
Illustrative allowance for selected public areas and a limited bedroom scope
Programme basis
Estimated timeframe, subject to room numbers, services and operational requirements
The Hotel Design Brief
The supplied brief centres on creating a consistent hospitality identity from arrival through to the guest room.
- Make reception easy to identify.
- Provide comfortable lounge and dining settings.
- Establish clear routes to guest accommodation.
- Coordinate bedroom furniture, storage and lighting.
- Select finishes appropriate for frequent cleaning and use.
- Consider housekeeping and maintenance alongside guest comfort.
Design Challenges & Architectural Responses
Every project is shaped by physical site parameters, technical regulations, and tailored spatial solutions. Detailed architectural coordination was resolved prior to site commencement using precise 3D CGI render services.
Challenge
Connecting Public Areas with Guest Rooms
Different parts of a hotel serve different purposes but should still feel related.
Establish a shared palette of timber tones, upholstery colours and selected details. Vary furniture and lighting to suit reception, dining, circulation and sleeping areas.
Challenge
Making Arrival Clear and Welcoming
A visually striking lobby also needs to accommodate check-in, waiting and luggage.
Coordinate the reception counter, seating and circulation around the expected arrival pattern. Consider staff equipment and storage on the working side of the desk.
Challenge
Balancing Bedroom Comfort with Practical Use
A guest room must accommodate sleeping, dressing, luggage and charging without feeling crowded.
Plan the bed, bedside furniture, wardrobe and luggage provision together. Check door swings and circulation before finalising fitted joinery.
Challenge
Creating Suitable Bedroom Lighting
One lighting setting cannot comfortably serve reading, dressing and night-time movement.
Combine ambient, bedside and task lighting with straightforward controls. Review glare, switch positions and access from the bed during detailed design.
Challenge
Specifying for Housekeeping and Maintenance
Decorative finishes need to withstand repeated cleaning and occasional repair.
Review upholstery, flooring, countertops and joinery against their intended use. Consider accessible fittings, replaceable components and the hotel’s maintenance procedures.
Challenge
Coordinating Refurbishment with Hotel Operation
Work can affect guest access, housekeeping routes and available rooms.
Establish whether the hotel will close, operate in phases or take selected rooms out of service. Programme deliveries and disruptive activities against the agreed operational plan.
These are design considerations relevant to the scheme. Actual site problems, client revisions and installed technical systems require confirmation from project records.
Indicative Investment & Programme Guide
Transparent cost planning, realistic schedule benchmarks, and coordinated turnkey execution.
Investment Guide
What Would a Similar Westminster Hotel Refurbishment Cost?
This is an initial editorial allowance for a defined package of public-area improvements and a limited number of guest rooms. It is not this project’s recorded expenditure, a quotation or a whole-hotel budget.
- Design and technical coordination: Surveys, layouts, room types and specifications
- Reception: Counter, storage, finishes and equipment interfaces
- Lounge and dining areas: Furniture, joinery, lighting and decoration
- Guest bedrooms: Number of rooms, furniture, wardrobes and furnishings
- Corridors: Flooring, wall finishes, lighting and signage
- Bathrooms: Number, condition and extent of replacement
- Installation and handover: Delivery, phased fitting, snagging and documentation
Major structural works, lifts, whole-building services replacement, commercial kitchens, laundry equipment and substantial acoustic construction require separate assessment unless expressly included.
Delivery Schedule
How Long Would a Similar Project Take?
For initial planning, a defined refurbishment package could allow approximately 6–12 months, with some stages overlapping.
- Brief, surveys and operational review: 3–5 weeks
- Concept design and room planning: 4–8 weeks
- Detailed design and specialist coordination: 6–10 weeks
- Sample room or prototype review, if required: Programme separately
- Approvals and landlord review: Confirm for the property and proposed work
- Procurement and manufacture: 10–18 weeks or longer for selected items
- Site refurbishment and installation: 10–20 weeks for the defined package
- Testing, snagging and handover: 2–3 weeks
Room layouts, furniture schedules, finish samples and lighting controls should be agreed before bulk orders are placed.
Planning a Hotel Refurbishment in Westminster?
Oraanj can help develop a coordinated interior direction around your guest experience, property and operational priorities.
Our studio manages complete refurbishment through structured turnkey interior design and fit-out and transparent interior design packages. For comparable project inspiration, explore our recent Covent Garden Bar & Lounge and Mayfair Cocktail Lounge case studies.
