A Connected Workplace for Focus and Collaboration
This City of London office scheme brings together shared working areas, meeting rooms and informal seating within a coordinated interior.
Timber ceiling details give the open spaces a consistent identity, while glazed partitions define enclosed rooms without creating a visually disconnected layout. Upholstered lounge furniture introduces a softer setting for visitors and informal discussions.
The design approach considers how people move between activities throughout the day—from individual desk work to team meetings and client presentations.
Explore our office interior design services in London.
Commissioned within Barbican and serving clients across nearby London Bridge, this project reflects our studio’s architectural approach to office interior design London.
Spatial Organisation, Craftsmanship & Finishes
A contemporary workplace scheme combining open-plan desks, enclosed meeting spaces and welcoming reception areas, with timber detailing, glazed divisions and settings for different working styles. Every material junction and surface finish was curated through our bespoke commercial FF&E procurement practice.
Timber ceiling details give the open spaces a consistent identity, while glazed partitions define enclosed rooms without creating a visually disconnected layout. Upholstered lounge furniture introduces a softer setting for visitors and informal discussions.
Feature
Timber Ceiling Detailing
Repeated slatted elements connect the open office and lounge settings. Their acoustic contribution should be confirmed against the specified construction.
Feature
Coordinated Workstations
Desk layouts, seating and cable management create an organised working area, developed around team requirements.
Feature
Glazed Meeting Rooms
Transparent divisions distinguish enclosed rooms while retaining visual continuity across the interior.
Project Overview & Spatial Parameters
A comprehensive overview of property parameters, scope of works, and core design objectives.
Location
City of London
Sector
Commercial office
Design focus
Hybrid working, meeting spaces and client arrival
Spaces described
Open-plan office, reception lounge, circulation areas and conference room
Principal features
Timber ceiling elements, glazed partitions, coordinated furniture and integrated technology
Indicative refurbishment allowance
£200,000–£350,000 excluding VAT, for a defined scope
Indicative programme
Approximately 6–12 months, subject to scope and approvals
The Workplace Brief
- Provide appropriate settings for focused and collaborative work.
- Coordinate desk arrangements with power, data and storage.
- Introduce enclosed rooms for meetings and presentations.
- Create a welcoming reception and visitor lounge.
- Maintain clear circulation between working areas.
- Allow practical flexibility as team requirements change.
Design Challenges & Architectural Responses
Every project is shaped by physical site parameters, technical regulations, and tailored spatial solutions. Detailed architectural coordination was resolved prior to site commencement using precise AutoCAD space planning drawings.
Challenge
Balancing Focused Work with Collaboration
Open-plan offices need to accommodate conversation without making concentration unnecessarily difficult.
Design Response
Position collaborative areas with regard to quieter desks. Consider circulation, enclosed rooms and acoustic requirements together rather than relying on furniture screens alone.
Challenge
Planning Daylight and Screen Positions
A bright office still needs careful workstation positioning to manage glare and reflections.
Design Response
Coordinate desk orientation, monitor positions, blinds and artificial lighting. Check the arrangement against the actual windows and individual workstation requirements.
Challenge
Making Flexibility Practical
Modular desks do not automatically make an office easy to rearrange.
Design Response
Coordinate furniture with power, data, lighting and ventilation. Identify which areas can change without substantial alteration to services.
Challenge
Providing Suitable Meeting Privacy
Glazed rooms can maintain visual connection, but confidentiality depends on the complete construction.
Design Response
Define the privacy required for each activity. Coordinate partitions, doors, ceilings and service routes, obtaining specialist assessment where necessary.
Challenge
A glazing rating alone should not be presented as a guarantee that conversations cannot be heard.
Coordinating Ceiling Elements and Services: Suspended timber features can affect lighting, ventilation and maintenance access.
Design Response
Develop the ceiling layout alongside the building-services design. Confirm support arrangements, access requirements and any intended acoustic performance before manufacture.
Challenge
Delivering Work within an Occupied Building
Commercial premises may have restrictions on deliveries, working hours and shared-area access.
Design Response
Establish landlord requirements and site logistics early. Programme deliveries and disruptive activities around the agreed building arrangements.
Indicative Investment & Programme Guide
Transparent cost planning, realistic schedule benchmarks, and coordinated turnkey execution.
Investment Guide
What Would a Similar City of London Refurbishment Cost?
This range may be suitable for selected improvements in premises with retained, serviceable base-build infrastructure. Potential elements include finishes, furniture, selected partitions, reception joinery and agreed lighting or power alterations.
- Workplace planning and design: Brief, surveys, layouts and specifications
- Partitions and finishes: Rooms included, flooring, ceilings and decoration
- Furniture: Desks, task chairs, meeting and lounge furniture
- Fitted joinery: Reception, storage and agreed refreshment facilities
- Power, data and lighting: Defined alterations and connections
- Meeting technology: Agreed equipment and installation
- Handover: Testing, snagging and agreed documentation
- Major heating, cooling or ventilation replacement, incoming-services upgrades, structural alterations and substantial acoustic construction require separate assessment unless expressly included.: Lease costs, relocation, business IT infrastructure and ongoing software subscriptions are excluded. Professional fees, surveys and landlord-related charges should be identified separately.
Allow a separate contingency of 10–15%, reviewed following survey, with VAT added where applicable.
Delivery Schedule
How Long Would a Similar Project Take?
For initial planning, allow approximately 6–12 months for a substantial coordinated refurbishment, with some stages overlapping.
- Workplace brief, surveys and feasibility: 3–5 weeks
- Space planning and concept design: 4–8 weeks
- Detailed design and services coordination: 6–10 weeks
- Landlord review and approvals: Confirm for the premises and proposed work
- Procurement and manufacture: 8–16 weeks or longer for selected items
- Site refurbishment and installation: 10–20 weeks
- Testing, snagging and handover: 2–3 weeks
Managing Workplace Changes
Team numbers, attendance assumptions, meeting-room requirements and equipment schedules should be agreed before procurement begins.
Planning an Office in the City of London?
Oraanj can help develop a workplace scheme around your team, working patterns and investment priorities.
Our studio manages complete refurbishment through structured turnkey interior design and fit-out and transparent interior design packages. For comparable project inspiration, explore our recent London Bridge Workplace and Whitechapel Creative Office case studies.
Frequently Asked Questions
There is no universal number. Requirements depend on employee attendance, meeting frequency, team size and the balance between private calls and group discussions. Reviewing workplace usage can help determine whether the office needs formal conference rooms, smaller meeting spaces or individual call booths.
Some office refurbishments can be completed in phases while parts of the premises remain occupied. This depends on the work involved, safe separation of construction activities, access routes and building services. Disruptive works may need to take place outside working hours or during a temporary relocation.
Many commercial leases require landlord consent for alterations, particularly changes to partitions, building services, ceilings or structural elements. A Licence to Alter may be necessary. The lease should be reviewed before work begins, and landlord approval should not be confused with Building Regulations or other statutory requirements.
Office alterations must consider escape routes, fire doors, alarms, emergency lighting and the existing fire strategy. New partitions or meeting rooms can affect these arrangements. The responsible person must review the fire risk assessment and ensure appropriate precautions remain in place. Building Regulations approval may also be required.
Glazed meeting rooms can achieve useful sound insulation, but ordinary glass partitions do not guarantee confidential conversations. Performance depends on the glazing system, frames, doors, seals and surrounding construction. Acoustic testing or specialist specifications may be appropriate for boardrooms and rooms used for sensitive discussions.
A hybrid workplace should be planned around actual attendance patterns rather than total employee headcount alone. Desk availability, meeting-room demand, video-call facilities, storage, power and data connections all influence the layout. Flexible furniture is most effective when building services can accommodate future changes.
A detailed quotation should identify design fees, surveys, partitions, ceilings, flooring, lighting, electrical and data works, furniture, joinery and installation. Check whether mechanical services, fire safety alterations, landlord approvals, VAT and contingency are included. Responsibilities for specialist contractors, testing and handover should also be clear.
